12-08-09 Design Review Committee Meeting Minutes

Site Plan Review Committee Minutes
For December 8, 2009

Meeting started at 2:15 P.M. in the East Hartford Town Hall
Second floor Conference Room “B”

Present: Michael Dayton
Denise Horan
Gary Zalucki
Larry Fraizer

Site Plan Application – 800 Connecticut Boulevard, Installation of a
electric generator and concrete pad to an existing office building.
Applicant: BKM Total Office

Upon a motion by Larry Frazier, seconded by Gary Zalucki, it was voted
unanimously to recommend approval of the application. As a result, it will
be forwarded to the Town Planning and Zoning Commission for final action
with the following condition:

· In evaluating this application, the Planning and Zoning Commission
has relied upon information provided by the applicant and, if such
information subsequently proves to be false, deceptive, incomplete,
and/or inaccurate, this permit shall be modified, suspended or
revoked.
· Comply with all Engineering Department Comments.

Site Plan Application – 441 Main Street A.K.A Willow Mobile Home Trailer
Park, Phase II Replacement of sanitary sewer & water lines to an existing
mobile home park.
Applicant: Mr. Kenneth Hoddinott

Upon a motion by Larry Frazier, seconded by Gary Zalucki, it was voted
unanimously to recommend approval of the application. As a result, it will
be forwarded to the Town Planning and Zoning Commission for final action
with the following condition:

· In evaluating this application, the Planning and Zoning Commission
has relied upon information provided by the applicant and, if such
information subsequently proves to be false, deceptive, incomplete,
and/or inaccurate, this permit shall be modified, suspended or
revoked.
· Comply with all Engineering Department Comments.

Site Plan Application – 13 Village Street, Installation of a new ramped
sidewalk and new front entrance door.
Applicant: Dan Lyman Russell

It was the consensus of the Committee to add the above application to the
agenda. Moreover, it was the consensus of the Committee to place this item
on next weeks agenda for further review.

On Hold

NONE

Ready for December 16, 2009

Site Plan Application – 170 Tolland Street, Construction of an 8,150
square foot car wash, parking lot and associated storm water drainage.
Applicant: 170 Tolland Street, LLC C/O Primrose Co’s

Site Plan Application – 1083 Burnside Avenue, Demolition of an existing
automobile filling station and canopy.
Applicant: Brian McCann, Kleinfelder

Meeting adjourned at 3:08 P.M.

Respectfully submitted,

Michael Dayton

_______________________________________________

12-08-09 Design Review Committee Meeting Agenda

SITE PLAN REVIEW COMMITTEE MEETING

Place East Hartford Town Hall
Second floor Conference Room “B”

Date: December 8, 2009

Time:

2:15 P.M.
Site Plan Application – 800 Connecticut Boulevard, Installation of a
electric generator and concrete pad to an existing office building.
Applicant: BKM Total Office

2:30 P.M.
Site Plan Application – 441 Main Street A.K.A Willow Mobile Home Trailer
Park, Phase II Replacement of sanitary sewer & water lines to an existing
mobile home park.
Applicant: Mr. Kenneth Hoddinott

On Hold

NONE

Ready for December 9, 2009

Site Plan Application – 170 Tolland Street, Construction of an 8,150
square foot car wash, parking lot and associated storm water drainage.
Applicant: 170 Tolland Street, LLC C/O Primrose Co’s

Site Plan Application – 1083 Burnside Avenue, Demolition of an existing
automobile filling station and canopy.
Applicant: Brian McCann, Kleinfelder

_______________________________________________

12-01-09 Design Review Committee Meeting Minutes

Site Plan Review Committee Minutes
For December 1, 2009

Meeting started at 2:15 P.M. in the East Hartford Town Hall
Second floor Conference Room “B”

Present: Michael Dayton
Denise Horan
Gary Zalucki

Sign Application – 1123 Main Street, Installation of one wall sign to an
existing commercial building.
“Western Union”
Applicant: Jeremy Waycote

Upon a motion by Denise Horan, seconded by Gary Zalucki it was voted
unanimously to approve the application as submitted.

On Hold

Site Plan Application – 800 Connecticut Boulevard, Installation of a
electric generator and concrete pad to an existing office building.
Applicant: BKM Total Office

Site Plan Application – 1083 Burnside Avenue, Demolition of an existing
automobile filling station and canopy.
Applicant: Brian McCann, Kleinfelder

Site Plan Application – 441 Main Street A.K.A Willow Mobile Home Trailer
Park, Phase II Replacement of sanitary sewer & water lines to an existing
mobile home park.
Applicant: Mr. Kenneth Hoddinott

Ready for December 9, 2009

Site Plan Application – 170 Tolland Street, Construction of an 8,150
square foot car wash, parking lot and associated storm water drainage.
Applicant: 170 Tolland Street, LLC C/O Primrose Co’s

Meeting adjourned at 2:45 P.M.

Respectfully submitted,

Michael Dayton

_______________________________________________

12-01-09 Design Review Committee Meeting Agenda

SITE PLAN REVIEW COMMITTEE MEETING

Place: East Hartford Town Hall
Second floor Conference Room “B”

Date: December 1, 2009

Time:

2:15 P.M.
Sign Application – 1123 Main Street, Installation of one wall sign to an
existing commercial building.
“Western Union”
Applicant: Jeremy Waycote

On Hold

Site Plan Application – 800 Connecticut Boulevard, Installation of a
electric generator and concrete pad to an existing office building.
Applicant: BKM Total Office

Site Plan Application – 1083 Burnside Avenue, Demolition of an existing
automobile filling station and canopy.
Applicant: Brian McCann, Kleinfelder

Site Plan Application – 441 Main Street A.K.A Willow Mobile Home Trailer
Park, Phase II Replacement of sanitary sewer & water lines to an existing
mobile home park.
Applicant: Mr. Kenneth Hoddinott

Ready for December 9, 2009

Site Plan Application – 170 Tolland Street, Construction of an 8,150
square foot car wash, parking lot and associated storm water drainage.
Applicant: 170 Tolland Street, LLC C/O Primrose Co’s

_______________________________________________

11-24-09 Design Review Committee Meeting Minutes

Site Plan Review Committee Minutes
For November 24, 2009

Meeting started at 2:15 P.M. in the East Hartford Town Hall
Second floor Conference Room “B”

Present: Michael Dayton
Denise Horan
Larry Fraizer
Gary Zalucki

Sign Application – 611 Main Street, Installation of one ground sign and
one wall sign to an existing automobile filling station. “BP”
Applicant: Core States, Enrico Tamburri

Upon a motion by Denise Horan, seconded by Larry Fraizer it was voted
unanimously to approve the application as submitted.

Sign Application – 1123 Main Street, Installation of one wall sign to an
existing commercial building.
“Western Union”
Applicant: Jeremy Waycote

Application not discussed, applicant not present. No votes taken.

Site Plan Application – 170 Tolland Street, Construction of an 8,150
square foot car wash, parking lot and associated storm water drainage.
Applicant: 170 Tolland Street, LLC C/O Primrose Co’s

Upon a motion by Larry Frazier, seconded by Gary Zalucki, it was voted
unanimously to recommend approval of the application. As a result, it will
be forwarded to the Town Planning and Zoning Commission for final action
with the following condition:

· In evaluating this application, the Planning and Zoning Commission
has relied upon information provided by the applicant and, if such
information subsequently proves to be false, deceptive,
incomplete, and/or inaccurate, this permit shall be modified,
suspended or revoked.
Comply with all Engineering Department Comments.

On Hold

Site Plan Application – 800 Connecticut Boulevard, Installation of a
electric generator and concrete pad to an existing office building.
Applicant: BKM Total Office

Site Plan Application – 1083 Burnside Avenue, Demolition of an existing
automobile filling station and canopy.
Applicant: Brian McCann, Kleinfelder

Site Plan Application – 441 Main Street A.K.A Willow Mobile Home Trailer
Park, Phase II Replacement of sanitary sewer & water lines to an existing
mobile home park.
Applicant: Mr. Kenneth Hoddinott

Ready for December 9, 2009

None

Meeting adjourned at 3:05 P.M.

Respectfully submitted,

Michael Dayton

_______________________________________________

11-24-09 Design Review Committee Meeting Agenda

SITE PLAN REVIEW COMMITTEE MEETING

Place: East Hartford Town Hall
Second floor Conference Room “B”

Date: November 24, 2009

Time:

2:15 P.M.
Sign Application – 611 Main Street, Installation of one ground sign and
one wall sign to an existing automobile filling station. “BP”
Applicant: Core States, Enrico Tamburri

2:25 P.M.
Sign Application – 1123 Main Street, Installation of one wall sign to an
existing commercial building.
“Western Union”
Applicant: Jeremy Waycote

2:35 P.M.
Site Plan Application – 170 Tolland Street, Construction of an 8,150
square foot car wash, parking lot and associated storm water drainage.
Applicant: 170 Tolland Street, LLC C/O Primrose Co’s

On Hold

Site Plan Application – 800 Connecticut Boulevard, Installation of a
electric generator and concrete pad to an existing office building.
Applicant: BKM Total Office

Site Plan Application – 1083 Burnside Avenue, Demolition of an existing
automobile filling station and canopy.
Applicant: Brian McCann, Kleinfelder

Site Plan Application – 441 Main Street A.K.A Willow Mobile Home Trailer
Park, Phase II Replacement of sanitary sewer & water lines to an existing
mobile home park.
Applicant: Mr. Kenneth Hoddinott

Ready for December 9, 2009

_______________________________________________

11-17-09 Design Review Committee Meeting Minutes

Site Plan Review Committee Minutes
For November 17, 2009

Meeting started at 2:15 P.M. in the East Hartford Town Hall
Second floor Conference Room “B”

Present: Michael Dayton
Denise Horan
Larry Fraizer
Gary Zalucki

Sign Application – 940 Silver Lane, Installation of new wall signs and
panel replacement of one ground sign to an existing Shopping Center.
“Stop & Shop”
Applicant: Agnoli sings

Upon a motion by Denise Horan, seconded by Larry Fraizer it was voted
unanimously to approve the application as submitted.

Site Plan Application – 170 Tolland Street, Construction of an 8,150
square foot car wash, parking lot and associated storm water drainage.
Applicant: 170 Tolland Street, LLC C/O Primrose Co’s

It was the consensus of the Committee to place this item on the agenda for
next week.

On Hold

Site Plan Application – 800 Connecticut Boulevard, Installation of a
electric generator and concrete pad to an existing office building.
Applicant: BKM Total Office

Site Plan Application – 1083 Burnside Avenue, Demolition of an existing
automobile filling station and canopy.
Applicant: Brian McCann, Kleinfelder

Ready for November 18, 2009

Site Plan Application – 22 Prestige Park Circle, Installation of a new
Handicapped ramp, replacement of exterior door and rebuilding of an
exterior platform and stairs to an existing industrial building.
Applicant: Dan Lyman Russell

Site Plan Application – 1 Pent Road, Installation of a prefabricated shed
to house SVE treatment system to an existing industrial building.
Applicant: Pratt & Whitney, Division of United Technologies Corporation

Site Plan Application – 363 Roberts Street A.K.A Holiday Inn, Façade
renovation and new signs to an existing hotel.
Applicant: GlobalTech Design, LLC

Site Plan Application – 441 Main Street A.K.A Willow Mobile Home Trailer
Park, Phase I Replacement of sanitary sewer & water lines to an existing
mobile home park.
Applicant: Mr. Kenneth Hoddinott

Meeting adjourned at 3:55 P.M.

Respectfully submitted,

Michael Dayton

_______________________________________________

11-18-09 Planning and Zoning Design Review Agenda

DESIGN REVIEW AGENDA PLANNING AND ZONING COMMISSION November 18, 2009

East Hartford Town Hall

Second Floor Conference Room “B” 5:00 P.M.

1. CALL TO ORDER

2. SITE PLAN APPLICATION– 22 Prestige Park Circle, Installation of a new

handicapped ramp, replacement of an exterior door and reconstruction of an exterior platform and stairs to an existing industrial building. Applicant: Dan Lyman Russell

3. SITE PLAN APPLICATION – 1 Pent Road, Installation of a prefabricated shed to house SVE treatment system to existing industrial site. Applicant: Pratt & Whitney, Division of United Technologies Corporation

4. SITE PLAN APPLICATION – 363 Roberts Street A.K.A Holiday Inn, Façade renovation and new signs to an existing hotel. Applicant: GlobalTech Design, LLC

5. SITE PLAN APPLICATION – 441 Main Street A.K.A Willow Mobile Home Trailer Park, Phase I Replacement of sanitary sewer and water utility lines and driveway resurfacing to an existing mobile home park. Applicant: Kenneth Hoddinot

6. SOIL EROSION AND SEDIMENTATION CONTROL APPLICATION–– 441 Main Street A.K.A Willow Mobile Home Trailer Park, Phase I Replacement of sanitary sewer and water utility lines and driveway resurfacing to an existing mobile home park. Applicant: Kenneth Hoddinot

7. APPROVAL OF MINUTES · Regular Session Minutes – October 14, 2009

8. APPROVAL OF 2010 TOWN PLANNING AND ZONING COMMISSION SCHEDULE AND CLOSE OUT DATES

9. BOND REDUCTIONS/RELEASES

· 221 Governor Street – Site Plan Modification Bond Release Applicant: Gengras Motorcycles / Marc Rienow

· 801 Silver Lane – Site Plan Modification Bond Release Applicant: Aldi Inc. / C/O LeAnne Wheeler

10. MISCELLANEOUS

11. ADJOURNMENT

_______________________________________________ You are subscribed to the Public Notices mailing list.

To unsubscribe from this list: http://www.ci.east-hartford.ct.us/subscriber

11-08-09 Planning and Zoning Design Review Agenda

East Hartford Town Hall November 12, 2009 Second Floor Conference Room “B” 5:00 P.M.

DESIGN REVIEW AGENDA PLANNING AND ZONING COMMISSION November 18, 2009

1. CALL TO ORDER

2. SITE PLAN APPLICATION– 22 Prestige Park Circle, Installation of a new

handicapped ramp, replacement of an exterior door and reconstruction of an exterior platform and stairs to an existing industrial building. Applicant: Dan Lyman Russell

3. SITE PLAN APPLICATION – 1 Pent Road, Installation of a prefabricated shed to house SVE treatment system to existing industrial site. Applicant: Pratt & Whitney, Division of United Technologies Corporation

4. SITE PLAN APPLICATION – 363 Roberts Street A.K.A Holiday Inn, Façade renovation and new signs to an existing hotel. Applicant: GlobalTech Design, LLC

5. SITE PLAN APPLICATION – 441 Main Street A.K.A Willow Mobile Home Trailer Park, Phase I Replacement of sanitary sewer and water utility lines and driveway resurfacing to an existing mobile home park. Applicant: Kenneth Hoddinot

6. SOIL EROSION AND SEDIMENTATION CONTROL APPLICATION–– 441 Main Street A.K.A Willow Mobile Home Trailer Park, Phase I Replacement of sanitary sewer and water utility lines and driveway resurfacing to an existing mobile home park. Applicant: Kenneth Hoddinot

7. APPROVAL OF MINUTES · Regular Session Minutes – October 14, 2009

8. APPROVAL OF 2010 TOWN PLANNING AND ZONING COMMISSION SCHEDULE AND CLOSE OUT DATES

9. BOND REDUCTIONS/RELEASES

· 221 Governor Street – Site Plan Modification Bond Release Applicant: Gengras Motorcycles / Marc Rienow

· 801 Silver Lane – Site Plan Modification Bond Release Applicant: Aldi Inc. / C/O LeAnne Wheeler

10. MISCELLANEOUS

11. ADJOURNMENT

_______________________________________________ You are subscribed to the Public Notices mailing list.

To unsubscribe from this list: http://www.ci.east-hartford.ct.us/subscriber

11-10-09 Design Review Committee Meeting Agenda

SITE PLAN REVIEW COMMITTEE MEETING

Place: East Hartford Town Hall Second floor Conference Room “B”

Date: November 10, 2009

Time:

2:15 P.M. Sign Application -1227 Burnside Avenue, Panel replacement of one ground sign to an existing commercial building. “H & K Laundry” Applicant: Srinivas Mothe

2:25 P.M. Sign Application – 940 Silver Lane, Installation of new wall signs and panel replacement of one ground sign to an existing Shopping Center. “Stop & Shop” Applicant: Agnoli sings

2:35 P.M. Site Plan Application – 1 Pent Road, Installation of a prefabricated shed to house SVE treatment system to an existing industrial building. Applicant: Pratt & Whitney, Division of United Technologies Corporation

2:50 P.M. Site Plan Application – 363 Roberts Street A.K.A Holiday Inn, Façade renovation and new signs to an existing hotel. Applicant: GlobalTech Design, LLC

3:05 P.M. Site Plan Application – 441 Main Street A.K.A Willow Mobile Home Trailer Park, Phase I Replacement of sanitary sewer & water lines to an existing mobile home park. Applicant: Mr. Kenneth Hoddinott

3:20 P.M. Site Plan Application – 1083 Burnside Avenue, Demolition of an existing automobile filling station and canopy. Applicant: Brian McCann, Kleinfelder

3:35 P.M. Site Plan Application – 170 Tolland Street, Construction of an 8,150 square foot car wash, parking lot and associated storm water drainage. Applicant: 170 Tolland Street, LLC C/O Primrose Co’s

On Hold

Site Plan Application – 800 Connecticut Boulevard, Installation of a electric generator and concrete pad to an existing office building. Applicant: BKM Total Office

Ready for November 18, 2009

Site Plan Application – 22 Prestige Park Circle, Installation of a new Handicapped ramp, replacement of exterior door and rebuilding of an exterior platform and stairs to an existing industrial building. Applicant: Dan Lyman Russell

_______________________________________________ You are subscribed to the Public Notices mailing list.

To unsubscribe from this list: http://www.ci.east-hartford.ct.us/subscriber

« Previous PageNext Page »