12-08-09 Design Review Committee Meeting Minutes
Site Plan Review Committee Minutes
For December 8, 2009
Meeting started at 2:15 P.M. in the East Hartford Town Hall
Second floor Conference Room B
Present: Michael Dayton
Denise Horan
Gary Zalucki
Larry Fraizer
Site Plan Application 800 Connecticut Boulevard, Installation of a
electric generator and concrete pad to an existing office building.
Applicant: BKM Total Office
Upon a motion by Larry Frazier, seconded by Gary Zalucki, it was voted
unanimously to recommend approval of the application. As a result, it will
be forwarded to the Town Planning and Zoning Commission for final action
with the following condition:
· In evaluating this application, the Planning and Zoning Commission
has relied upon information provided by the applicant and, if such
information subsequently proves to be false, deceptive, incomplete,
and/or inaccurate, this permit shall be modified, suspended or
revoked.
· Comply with all Engineering Department Comments.
Site Plan Application 441 Main Street A.K.A Willow Mobile Home Trailer
Park, Phase II Replacement of sanitary sewer & water lines to an existing
mobile home park.
Applicant: Mr. Kenneth Hoddinott
Upon a motion by Larry Frazier, seconded by Gary Zalucki, it was voted
unanimously to recommend approval of the application. As a result, it will
be forwarded to the Town Planning and Zoning Commission for final action
with the following condition:
· In evaluating this application, the Planning and Zoning Commission
has relied upon information provided by the applicant and, if such
information subsequently proves to be false, deceptive, incomplete,
and/or inaccurate, this permit shall be modified, suspended or
revoked.
· Comply with all Engineering Department Comments.
Site Plan Application 13 Village Street, Installation of a new ramped
sidewalk and new front entrance door.
Applicant: Dan Lyman Russell
It was the consensus of the Committee to add the above application to the
agenda. Moreover, it was the consensus of the Committee to place this item
on next weeks agenda for further review.
On Hold
NONE
Ready for December 16, 2009
Site Plan Application 170 Tolland Street, Construction of an 8,150
square foot car wash, parking lot and associated storm water drainage.
Applicant: 170 Tolland Street, LLC C/O Primrose Cos
Site Plan Application 1083 Burnside Avenue, Demolition of an existing
automobile filling station and canopy.
Applicant: Brian McCann, Kleinfelder
Meeting adjourned at 3:08 P.M.
Respectfully submitted,
Michael Dayton
_______________________________________________
12-08-09 Design Review Committee Meeting Agenda
SITE PLAN REVIEW COMMITTEE MEETING
Place East Hartford Town Hall
Second floor Conference Room B
Date: December 8, 2009
Time:
2:15 P.M.
Site Plan Application 800 Connecticut Boulevard, Installation of a
electric generator and concrete pad to an existing office building.
Applicant: BKM Total Office
2:30 P.M.
Site Plan Application 441 Main Street A.K.A Willow Mobile Home Trailer
Park, Phase II Replacement of sanitary sewer & water lines to an existing
mobile home park.
Applicant: Mr. Kenneth Hoddinott
On Hold
NONE
Ready for December 9, 2009
Site Plan Application 170 Tolland Street, Construction of an 8,150
square foot car wash, parking lot and associated storm water drainage.
Applicant: 170 Tolland Street, LLC C/O Primrose Cos
Site Plan Application 1083 Burnside Avenue, Demolition of an existing
automobile filling station and canopy.
Applicant: Brian McCann, Kleinfelder
_______________________________________________
12-01-09 Design Review Committee Meeting Minutes
Site Plan Review Committee Minutes
For December 1, 2009
Meeting started at 2:15 P.M. in the East Hartford Town Hall
Second floor Conference Room B
Present: Michael Dayton
Denise Horan
Gary Zalucki
Sign Application 1123 Main Street, Installation of one wall sign to an
existing commercial building.
Western Union
Applicant: Jeremy Waycote
Upon a motion by Denise Horan, seconded by Gary Zalucki it was voted
unanimously to approve the application as submitted.
On Hold
Site Plan Application 800 Connecticut Boulevard, Installation of a
electric generator and concrete pad to an existing office building.
Applicant: BKM Total Office
Site Plan Application 1083 Burnside Avenue, Demolition of an existing
automobile filling station and canopy.
Applicant: Brian McCann, Kleinfelder
Site Plan Application 441 Main Street A.K.A Willow Mobile Home Trailer
Park, Phase II Replacement of sanitary sewer & water lines to an existing
mobile home park.
Applicant: Mr. Kenneth Hoddinott
Ready for December 9, 2009
Site Plan Application 170 Tolland Street, Construction of an 8,150
square foot car wash, parking lot and associated storm water drainage.
Applicant: 170 Tolland Street, LLC C/O Primrose Cos
Meeting adjourned at 2:45 P.M.
Respectfully submitted,
Michael Dayton
_______________________________________________
12-01-09 Design Review Committee Meeting Agenda
SITE PLAN REVIEW COMMITTEE MEETING
Place: East Hartford Town Hall
Second floor Conference Room B
Date: December 1, 2009
Time:
2:15 P.M.
Sign Application 1123 Main Street, Installation of one wall sign to an
existing commercial building.
Western Union
Applicant: Jeremy Waycote
On Hold
Site Plan Application 800 Connecticut Boulevard, Installation of a
electric generator and concrete pad to an existing office building.
Applicant: BKM Total Office
Site Plan Application 1083 Burnside Avenue, Demolition of an existing
automobile filling station and canopy.
Applicant: Brian McCann, Kleinfelder
Site Plan Application 441 Main Street A.K.A Willow Mobile Home Trailer
Park, Phase II Replacement of sanitary sewer & water lines to an existing
mobile home park.
Applicant: Mr. Kenneth Hoddinott
Ready for December 9, 2009
Site Plan Application 170 Tolland Street, Construction of an 8,150
square foot car wash, parking lot and associated storm water drainage.
Applicant: 170 Tolland Street, LLC C/O Primrose Cos
_______________________________________________
11-24-09 Design Review Committee Meeting Minutes
Site Plan Review Committee Minutes
For November 24, 2009
Meeting started at 2:15 P.M. in the East Hartford Town Hall
Second floor Conference Room B
Present: Michael Dayton
Denise Horan
Larry Fraizer
Gary Zalucki
Sign Application 611 Main Street, Installation of one ground sign and
one wall sign to an existing automobile filling station. BP
Applicant: Core States, Enrico Tamburri
Upon a motion by Denise Horan, seconded by Larry Fraizer it was voted
unanimously to approve the application as submitted.
Sign Application 1123 Main Street, Installation of one wall sign to an
existing commercial building.
Western Union
Applicant: Jeremy Waycote
Application not discussed, applicant not present. No votes taken.
Site Plan Application 170 Tolland Street, Construction of an 8,150
square foot car wash, parking lot and associated storm water drainage.
Applicant: 170 Tolland Street, LLC C/O Primrose Cos
Upon a motion by Larry Frazier, seconded by Gary Zalucki, it was voted
unanimously to recommend approval of the application. As a result, it will
be forwarded to the Town Planning and Zoning Commission for final action
with the following condition:
· In evaluating this application, the Planning and Zoning Commission
has relied upon information provided by the applicant and, if such
information subsequently proves to be false, deceptive,
incomplete, and/or inaccurate, this permit shall be modified,
suspended or revoked.
Comply with all Engineering Department Comments.
On Hold
Site Plan Application 800 Connecticut Boulevard, Installation of a
electric generator and concrete pad to an existing office building.
Applicant: BKM Total Office
Site Plan Application 1083 Burnside Avenue, Demolition of an existing
automobile filling station and canopy.
Applicant: Brian McCann, Kleinfelder
Site Plan Application 441 Main Street A.K.A Willow Mobile Home Trailer
Park, Phase II Replacement of sanitary sewer & water lines to an existing
mobile home park.
Applicant: Mr. Kenneth Hoddinott
Ready for December 9, 2009
None
Meeting adjourned at 3:05 P.M.
Respectfully submitted,
Michael Dayton
_______________________________________________
11-24-09 Design Review Committee Meeting Agenda
SITE PLAN REVIEW COMMITTEE MEETING
Place: East Hartford Town Hall
Second floor Conference Room B
Date: November 24, 2009
Time:
2:15 P.M.
Sign Application 611 Main Street, Installation of one ground sign and
one wall sign to an existing automobile filling station. BP
Applicant: Core States, Enrico Tamburri
2:25 P.M.
Sign Application 1123 Main Street, Installation of one wall sign to an
existing commercial building.
Western Union
Applicant: Jeremy Waycote
2:35 P.M.
Site Plan Application 170 Tolland Street, Construction of an 8,150
square foot car wash, parking lot and associated storm water drainage.
Applicant: 170 Tolland Street, LLC C/O Primrose Cos
On Hold
Site Plan Application 800 Connecticut Boulevard, Installation of a
electric generator and concrete pad to an existing office building.
Applicant: BKM Total Office
Site Plan Application 1083 Burnside Avenue, Demolition of an existing
automobile filling station and canopy.
Applicant: Brian McCann, Kleinfelder
Site Plan Application 441 Main Street A.K.A Willow Mobile Home Trailer
Park, Phase II Replacement of sanitary sewer & water lines to an existing
mobile home park.
Applicant: Mr. Kenneth Hoddinott
Ready for December 9, 2009
_______________________________________________
11-17-09 Design Review Committee Meeting Minutes
Site Plan Review Committee Minutes
For November 17, 2009
Meeting started at 2:15 P.M. in the East Hartford Town Hall
Second floor Conference Room B
Present: Michael Dayton
Denise Horan
Larry Fraizer
Gary Zalucki
Sign Application 940 Silver Lane, Installation of new wall signs and
panel replacement of one ground sign to an existing Shopping Center.
Stop & Shop
Applicant: Agnoli sings
Upon a motion by Denise Horan, seconded by Larry Fraizer it was voted
unanimously to approve the application as submitted.
Site Plan Application 170 Tolland Street, Construction of an 8,150
square foot car wash, parking lot and associated storm water drainage.
Applicant: 170 Tolland Street, LLC C/O Primrose Cos
It was the consensus of the Committee to place this item on the agenda for
next week.
On Hold
Site Plan Application 800 Connecticut Boulevard, Installation of a
electric generator and concrete pad to an existing office building.
Applicant: BKM Total Office
Site Plan Application 1083 Burnside Avenue, Demolition of an existing
automobile filling station and canopy.
Applicant: Brian McCann, Kleinfelder
Ready for November 18, 2009
Site Plan Application 22 Prestige Park Circle, Installation of a new
Handicapped ramp, replacement of exterior door and rebuilding of an
exterior platform and stairs to an existing industrial building.
Applicant: Dan Lyman Russell
Site Plan Application 1 Pent Road, Installation of a prefabricated shed
to house SVE treatment system to an existing industrial building.
Applicant: Pratt & Whitney, Division of United Technologies Corporation
Site Plan Application 363 Roberts Street A.K.A Holiday Inn, Façade
renovation and new signs to an existing hotel.
Applicant: GlobalTech Design, LLC
Site Plan Application 441 Main Street A.K.A Willow Mobile Home Trailer
Park, Phase I Replacement of sanitary sewer & water lines to an existing
mobile home park.
Applicant: Mr. Kenneth Hoddinott
Meeting adjourned at 3:55 P.M.
Respectfully submitted,
Michael Dayton
_______________________________________________
11-18-09 Planning and Zoning Design Review Agenda
DESIGN REVIEW AGENDA PLANNING AND ZONING COMMISSION November 18, 2009
East Hartford Town Hall
Second Floor Conference Room B 5:00 P.M.
1. CALL TO ORDER
2. SITE PLAN APPLICATION 22 Prestige Park Circle, Installation of a new
handicapped ramp, replacement of an exterior door and reconstruction of an exterior platform and stairs to an existing industrial building. Applicant: Dan Lyman Russell
3. SITE PLAN APPLICATION 1 Pent Road, Installation of a prefabricated shed to house SVE treatment system to existing industrial site. Applicant: Pratt & Whitney, Division of United Technologies Corporation
4. SITE PLAN APPLICATION 363 Roberts Street A.K.A Holiday Inn, Façade renovation and new signs to an existing hotel. Applicant: GlobalTech Design, LLC
5. SITE PLAN APPLICATION 441 Main Street A.K.A Willow Mobile Home Trailer Park, Phase I Replacement of sanitary sewer and water utility lines and driveway resurfacing to an existing mobile home park. Applicant: Kenneth Hoddinot
6. SOIL EROSION AND SEDIMENTATION CONTROL APPLICATION 441 Main Street A.K.A Willow Mobile Home Trailer Park, Phase I Replacement of sanitary sewer and water utility lines and driveway resurfacing to an existing mobile home park. Applicant: Kenneth Hoddinot
7. APPROVAL OF MINUTES · Regular Session Minutes October 14, 2009
8. APPROVAL OF 2010 TOWN PLANNING AND ZONING COMMISSION SCHEDULE AND CLOSE OUT DATES
9. BOND REDUCTIONS/RELEASES
· 221 Governor Street Site Plan Modification Bond Release Applicant: Gengras Motorcycles / Marc Rienow
· 801 Silver Lane Site Plan Modification Bond Release Applicant: Aldi Inc. / C/O LeAnne Wheeler
10. MISCELLANEOUS
11. ADJOURNMENT
_______________________________________________ You are subscribed to the Public Notices mailing list.
To unsubscribe from this list: http://www.ci.east-hartford.ct.us/subscriber
11-08-09 Planning and Zoning Design Review Agenda
East Hartford Town Hall November 12, 2009 Second Floor Conference Room B 5:00 P.M.
DESIGN REVIEW AGENDA PLANNING AND ZONING COMMISSION November 18, 2009
1. CALL TO ORDER
2. SITE PLAN APPLICATION 22 Prestige Park Circle, Installation of a new
handicapped ramp, replacement of an exterior door and reconstruction of an exterior platform and stairs to an existing industrial building. Applicant: Dan Lyman Russell
3. SITE PLAN APPLICATION 1 Pent Road, Installation of a prefabricated shed to house SVE treatment system to existing industrial site. Applicant: Pratt & Whitney, Division of United Technologies Corporation
4. SITE PLAN APPLICATION 363 Roberts Street A.K.A Holiday Inn, Façade renovation and new signs to an existing hotel. Applicant: GlobalTech Design, LLC
5. SITE PLAN APPLICATION 441 Main Street A.K.A Willow Mobile Home Trailer Park, Phase I Replacement of sanitary sewer and water utility lines and driveway resurfacing to an existing mobile home park. Applicant: Kenneth Hoddinot
6. SOIL EROSION AND SEDIMENTATION CONTROL APPLICATION 441 Main Street A.K.A Willow Mobile Home Trailer Park, Phase I Replacement of sanitary sewer and water utility lines and driveway resurfacing to an existing mobile home park. Applicant: Kenneth Hoddinot
7. APPROVAL OF MINUTES · Regular Session Minutes October 14, 2009
8. APPROVAL OF 2010 TOWN PLANNING AND ZONING COMMISSION SCHEDULE AND CLOSE OUT DATES
9. BOND REDUCTIONS/RELEASES
· 221 Governor Street Site Plan Modification Bond Release Applicant: Gengras Motorcycles / Marc Rienow
· 801 Silver Lane Site Plan Modification Bond Release Applicant: Aldi Inc. / C/O LeAnne Wheeler
10. MISCELLANEOUS
11. ADJOURNMENT
_______________________________________________ You are subscribed to the Public Notices mailing list.
To unsubscribe from this list: http://www.ci.east-hartford.ct.us/subscriber
11-10-09 Design Review Committee Meeting Agenda
SITE PLAN REVIEW COMMITTEE MEETING
Place: East Hartford Town Hall Second floor Conference Room B
Date: November 10, 2009
Time:
2:15 P.M. Sign Application -1227 Burnside Avenue, Panel replacement of one ground sign to an existing commercial building. H & K Laundry Applicant: Srinivas Mothe
2:25 P.M. Sign Application 940 Silver Lane, Installation of new wall signs and panel replacement of one ground sign to an existing Shopping Center. Stop & Shop Applicant: Agnoli sings
2:35 P.M. Site Plan Application 1 Pent Road, Installation of a prefabricated shed to house SVE treatment system to an existing industrial building. Applicant: Pratt & Whitney, Division of United Technologies Corporation
2:50 P.M. Site Plan Application 363 Roberts Street A.K.A Holiday Inn, Façade renovation and new signs to an existing hotel. Applicant: GlobalTech Design, LLC
3:05 P.M. Site Plan Application 441 Main Street A.K.A Willow Mobile Home Trailer Park, Phase I Replacement of sanitary sewer & water lines to an existing mobile home park. Applicant: Mr. Kenneth Hoddinott
3:20 P.M. Site Plan Application 1083 Burnside Avenue, Demolition of an existing automobile filling station and canopy. Applicant: Brian McCann, Kleinfelder
3:35 P.M. Site Plan Application 170 Tolland Street, Construction of an 8,150 square foot car wash, parking lot and associated storm water drainage. Applicant: 170 Tolland Street, LLC C/O Primrose Cos
On Hold
Site Plan Application 800 Connecticut Boulevard, Installation of a electric generator and concrete pad to an existing office building. Applicant: BKM Total Office
Ready for November 18, 2009
Site Plan Application 22 Prestige Park Circle, Installation of a new Handicapped ramp, replacement of exterior door and rebuilding of an exterior platform and stairs to an existing industrial building. Applicant: Dan Lyman Russell
_______________________________________________ You are subscribed to the Public Notices mailing list.
To unsubscribe from this list: http://www.ci.east-hartford.ct.us/subscriber


