Taco Bell runs for the border… the East Hartford/Glastonbury border.

I’ve been noticing on the minutes and agendas coming through my mail box that a piece of new development appears to be on the way for Putnam Bridge Plaza on the East Hartford/Glastonbury line. In addition to the Arthur Treachers/Roasters Express/Nathan’s combo restaurant accompanying Shop Rite (Soft open on the 23rd! thanks Bill), Home Depot, Pet Smart, TD Bank, Cingular and a variety of other businesses, with even more on the other side of the road, it appears a new Taco Bell is imminent.

I am not exactly sure yet where in the plaza the taco bell will be located. With an application Address of 1 Main Street it would have to be in the right side of the plaza.

My hat is off to the Andreo family, owners of the Putnam Plazas. While it seems we can’t get government backed development in East Hartford that doesn’t include bottom line busting tax exemptions and property giveaways this entrepreneurial family has brought millions of dollars in development to both East Hartford and Glastonbury and improved the quality of life for all of the residents of East Hartford’s south end and Glastonbury’s north end. And all with no incentive but to succeed. Keep it up Andreo family.

The new Taco Bell received the approval of the Design Review Committee on 05/25 and there will be a Public Hearing on the application before the Planning and Zoning commission on June 23rd at 7:30PM in the council chambers. The application appears on the regular agenda for action following the Public Hearing.

01-19-10 Design Review Committee Meeting Agenda

<!–
body{margin-left:10px;margin-right:10px;margin-top:10px;margin-bottom:10px;}

01-12-10 Design Review Committee Meeting Minutes

<!–
body{margin-left:10px;margin-right:10px;margin-top:10px;margin-bottom:10px;}

01-12-10 Design Review Committee Meeting Agenda

<!–
body{margin-left:10px;margin-right:10px;margin-top:10px;margin-bottom:10px;}

01-05-10 Design Review Committee Meeting Minutes

<!–
body{margin-left:10px;margin-right:10px;margin-top:10px;margin-bottom:10px;}

01-05-10 Design Review Committee Meeting Agenda

SITE PLAN REVIEW COMMITTEE MEETING

Place East Hartford Town Hall
Second floor Conference Room “B”

Date January 5, 2010

Time:

2:15 P.M.
Site Plan Application – 452 Main Street, Installation of three roof top
panel antennas, three roof top microwave antennas and one roof top GPS
antenna.
Applicant: Clearwire Technology / Maxton Technology

2:30 P.M.
Site Plan Application – 94 Connecticut Boulevard, Installation of
electrical generator to an existing office building.
Applicant: Gary Sweet / ADM Architects

2:45 P.M.
Site Plan Application – 411 Prospect Street, Installation of electrical
generator to an existing office building.
Applicant: Gary Sweet / ADM Architects

3:00 P.M.
Site Plan Application – 170 Tolland Street, Construction of an 8,150
square foot car wash, parking lot and associated storm water drainage.
Applicant: 170 Tolland Street, LLC C/O Primrose Co’s

On Hold

NONE

Ready for January 13, 2010

NONE

_______________________________________________

12-29-09 Design Review Committee Meeting Minutes

Site Plan Review Committee Minutes
For December 29, 2009

Meeting started at 2:15 P.M. in the East Hartford Town Hall
Second floor Conference Room “B”

Present: Michael Dayton
Denise Horan
Gary Zalucki
Larry Fraizer

Site Plan Application – 452 Main Street, Installation of three roof top
panel antennas, three roof top microwave antennas and one roof top GPS
antenna.
Applicant: Clearwire Technology / Maxton Technology

It was the consensus of the Committee to place this item on the agenda for
next week.

Site Plan Application – 170 Tolland Street, Construction of an 8,150
square foot car wash, parking lot and associated storm water drainage.
Applicant: 170 Tolland Street, LLC C/O Primrose Co’s

Application not discussed, applicant not present. No votes taken.

On Hold

NONE

Ready for January 13, 2010

NONE

Meeting adjourned at 2:42P.M.

Respectfully submitted,

Michael Dayton

_______________________________________________

12-29-09 Design Review Committee Meeting Agenda

SITE PLAN REVIEW COMMITTEE MEETING

Place East Hartford Town Hall
Second floor Conference Room “B”

Date: December 29, 2009

Time:

2:15 P.M.
Site Plan Application – 452 Main Street, Installation of three roof top
panel antennas, three roof top microwave antennas and one roof top GPS
antenna.
Applicant: Clearwire Technology / Maxton Technology

2:30 P.M.
Site Plan Application – 170 Tolland Street, Construction of an 8,150
square foot car wash, parking lot and associated storm water drainage.
Applicant: 170 Tolland Street, LLC C/O Primrose Co’s

On Hold

NONE

Ready for January 13, 2010

NONE

_______________________________________________

12-15-09 Design Review Committee Meeting Minutes

Site Plan Review Committee Minutes
For December 15, 2009

Meeting started at 2:15 P.M. in the East Hartford Town Hall
Second floor Conference Room “B”

Present: Michael Dayton
Denise Horan
Gary Zalucki

Sign Application – 13 Village Street, Installation of one projecting sign
to an existing commercial building.
“Eastern Video Services”
Applicant: Sign A Rama

Upon a motion by Denise Horan, seconded by Gary Zalucki, it was voted
unanimously to approve the application as submitted.

Site Plan Application – 22 Prestige Park Circle, Installation of a new
ramped sidewalk and new front entrance door.
Applicant: Dan Lyman Russell

Upon a motion by Gary Zalucki , seconded by Denise Horan, it was voted
unanimously to recommend approval of the application. As a result, it will
be forwarded to the Town Planning and Zoning Commission for final action
with the following condition:

· In evaluating this application, the Planning and Zoning Commission
has relied upon information provided by the applicant and, if such
information subsequently proves to be false, deceptive, incomplete,
and/or inaccurate, this permit shall be modified, suspended or
revoked.
· Comply with all Engineering Department Comments.

On Hold

NONE

Ready for December 16, 2009

Site Plan Application – 170 Tolland Street, Construction of an 8,150
square foot car wash, parking lot and associated storm water drainage.
Applicant: 170 Tolland Street, LLC C/O Primrose Co’s

Site Plan Application – 1083 Burnside Avenue, Demolition of an existing
automobile filling station and canopy.
Applicant: Brian McCann, Kleinfelder

Meeting adjourned at 2:58 P.M.

Respectfully submitted,

Michael Dayton

_______________________________________________

12-15-09 Design Review Committee Meeting Agenda

SITE PLAN REVIEW COMMITTEE MEETING (amended 12-14-09)

Place East Hartford Town Hall
Second floor Conference Room “B”

Date: December 15, 2009

Time:

2:15 P.M.
Sign Application – 13 Village Street, Installation of one projecting sign
to an existing commercial building.
“Eastern Video Services”
Applicant: Sign A Rama

2:30 P.M.
Site Plan Application – 22 Prestige Park Circle, Installation of a new
ramped sidewalk and new front entrance door.
Applicant: Dan Lyman Russell

On Hold

NONE

Ready for December 16, 2009

Site Plan Application – 170 Tolland Street, Construction of an 8,150
square foot car wash, parking lot and associated storm water drainage.
Applicant: 170 Tolland Street, LLC C/O Primrose Co’s

Site Plan Application – 1083 Burnside Avenue, Demolition of an existing
automobile filling station and canopy.
Applicant: Brian McCann, Kleinfelder

Site Plan Application – 800 Connecticut Boulevard, Installation of a
electric generator and concrete pad to an existing office building.
Applicant: BKM Total Office

Site Plan Application – 441 Main Street A.K.A Willow Mobile Home Trailer
Park, Phase II Replacement of sanitary sewer & water lines to an existing
mobile home park.
Applicant: Mr. Kenneth Hoddinott

_______________________________________________

Next Page »